Templates and worksheets
The spreadsheets and documents the guides tell you to produce. Every one lists its contents before you download it, so you can decide not to.
8 of 8 require no email. Free to use, adapt and distribute, including commercially, with no attribution required.
Fleet finance
-
Chargeback rate workbook
XLSX · 18 KBBuilds a two-part internal service fund rate for every vehicle class at once, escalates the replacement reserve to future purchase cost, and tracks recovery month by month.
- How to use
- Classes — one row per vehicle class, all inputs
- Rate build — the arithmetic, per class
- Rate schedule (print) — one page to publish
- Recovery tracker — 12 months, planned against actual
- Sources & method
-
Rate memo template
DOCX · 20 KBOne page per vehicle class showing the inputs, the arithmetic and the resulting two-part rate — the document you hand a department head instead of relitigating the method.
- How to use this template (delete before circulating)
- Header block — class, fiscal year, prepared by, date, supersedes
- Rate — fixed $/month and variable $/mile, boxed at the top
- Replacement reserve basis — cost, source, escalation, cycle, salvage
- Other fixed components — amount and allocation basis for each
- Variable rate basis — trailing period, MPG, fuel, maintenance, miles
- Comparison against published schedules (optional)
- Approval — prepared by, reviewed by finance, effective date
- One memo per class, pre-filled with a worked example for four classes
- About this template and sources (delete before circulating)
Replacement & lifecycle
-
Replacement request package
DOCX · 13 KBThe narrative you hand to a council or board: the consequence stated first, the four numbers every official asks about with a source line for each, and a tiered ask that can be cut without falling apart.
- The ask, in three sentences
- The four numbers
- Tiered request — Critical / Priority / Planned
- How the list was built
- Deferral answers, one line per unit
- What not to put in this document (preparer guidance, deleted before circulating)
- Attachment A — ranked replacement list
- After the decision — funded, deferred, stated reason
- About this template (final page)
-
Replacement scoring worksheet
XLSX · 23 KBScores every unit in the fleet on the six factors, ranks them, and tests whether your band thresholds produce a replacement list your budget can actually fund.
- How to use
- Score model — every parameter, editable
- Units — one row per unit, six factors scored
- Ranked list (print) — the attachment for the budget meeting
- Band test — distribution, band shares, funding line check
- Sources & method
Maintenance & uptime
-
PM compliance tracker
XLSX · 38 KBProjects every unit’s next PM due point, computes compliance against a window you declare rather than one we assume, and tells you whether being behind is a scheduling problem or a staffing one.
- How to use
- Definitions — the window, the denominator and the deferral rule, as input cells
- Schedule — one row per unit per service type, with projected due date and reading staleness
- Completions log — what came due, what got done, what was deferred
- Monthly compliance — 12 months, compliance % against unplanned downtime
- Capacity check — PM hours due against technician hours available
- Sources & method
Procurement & buying
-
Cooperative purchase justification memo
DOCX · 16 KBThe one page that goes in the procurement file with the purchase order: the authority you relied on, the contract you bought from, what you compared the price against, and the determination sentence signed and dated by the person who made it.
- Header block, and a how-to-use box you delete before circulating
- 1. Purchase identified
- 2. Authority to use a cooperative contract
- 3. Contract identified — cooperative, number, supplier, dates
- 4. Eligibility confirmation
- 5. Competitive process relied upon
- 6. Administrative fee disclosure
- 7. Price reasonableness
- 8. Why not our own solicitation
- 9. Determination — with a worked example to delete
- 10. Approval and retention, with the attachment checklist
- Sources and method (final page)
Compliance
-
CMV applicability determination record
DOCX · 14 KBA dated, signed record of whether a given vehicle or group is a commercial motor vehicle, with the threshold test, the interstate-commerce reasoning, the CDL answer and the short-haul determination written down and retained.
- How to use this record — instructional box, deleted before circulating
- Vehicle or group identified — plate ratings, towed units, capacity, hazmat
- Threshold test — the four 49 CFR 390.5 tests as checkboxes with cites
- Interstate commerce determination — three prompts and a written rationale
- Result — federal scope, state intrastate answer, who confirmed it
- Obligations if in scope — seven-row checklist with owner and status
- CDL determination — Class A/B/C tests, and why no-CDL is not no-rules
- Short-haul exception (395.1(e)) — radius, return time and the two caveats
- Signature, date and next review date
- Regulatory references and method (final page)
Costs & KPIs
-
Cost per mile / cost per hour workbook
XLSX · 23 KBBuilds cost per mile and cost per hour for every unit with depreciation in it, splits fixed from variable so you can tell an underused vehicle from a hard-working one, and prints the declaration of what is included without which no cost per mile is comparable.
- How to use
- Methodology declaration — the six answers that decide what your number means
- Units — row per unit, fixed and variable split, $/mi and $/hr
- By class — the only rollup that is arithmetically honest
- Trend — 12 months per unit, on that unit’s own denominator
- Sources & method
More in progress
Three further assets are specified: the internal service fund conversion kit, the fleet safety program kit, and the shop rate and break-even model. All three are multi-file kits held back until there is somewhere for an email gate to post — rather than shipping a gate that does nothing.